Bid ZYSQ 1.3 for Phase IV project of Zhuyuan Sewage Treatment Plant (Biochemical treatment engineering (Lot for 500,000 tons of sewage))
Business sector: Water conservancy and water utilities
Location: Shanghai
Commencement time: December, 2020
Participation mode: Engineering procurement construction
Project breakthroughs: In this project, STEC applied the prefabrication and assembly technology on large scale and in large volume for the first time into the field of water utilities engineering. A total of 2,488 prefabricated components were adopted, with a maximum height of about 10.12 m and the heaviest weight of 31.13 tons.
Location: Shanghai
Commencement time: December, 2020
Participation mode: Engineering procurement construction
Project breakthroughs: In this project, STEC applied the prefabrication and assembly technology on large scale and in large volume for the first time into the field of water utilities engineering. A total of 2,488 prefabricated components were adopted, with a maximum height of about 10.12 m and the heaviest weight of 31.13 tons.