Shanghai North Cross Channel
Business Section:Tunnel
Location:Shanghai
Project Completion Date:Dec. 2014
Participating Mode:EPC
Shield Parameter:15m- Diameter Articulated Slurry Balance Shield
Project’s Breakthrough:Massive-Diameter Shield Tunnel Continuously Crossing Six Metro Tunnels in Operation and 92 Buildings
Shanghai Yangtze River Tunnel
Business Section:Tunnel
Location:Shanghai
Project Operation Date:10, 2009
Participating Mode:Managing Contractor
Shield Parameter:15.43m Slurry Balance Shield
Project’s Breakthrough:World’s Longest Distance shield tunnel with Single Excavation and largest diameter When Completed
Qinwang Tunnel Project in Fuyang District, Hangzhou City
Location: Hangzhou City, Zhejiang Province
Commencement time: January, 2020
Participation mode: EPC design, construction and investment
Shield tunneling machine specifications: Slurry balance shield tunneling machine with a diameter of 15.76m
Project breakthroughs: The first shield tunnel for both highway and railway purposes in Zhejiang Province, and the largest shield tunnel in Eastern China.
River-crossing tunnel at West Jianning Road, Nanjing
Location: Nanjing City, Jiangsu Province
Commencement time: May, 2020
Completion / operation time: To be completed.
Participation mode: Engineering procurement construction
Shield tunneling machine specifications: Slurry balance shield tunneling machine with a diameter of 15.07m
Project breakthroughs: The deepest silt soil and silt foundation pit in Nanjing; the shield tunneling machine penetrates the Yangtze River levee twice.
Westward route extension project of Jihua Road in Foshan
Location: Foshan City, Guangdong Province
Commencement time: April, 2021
Participation mode: EPC design, construction and operation
Shield tunneling machine specifications: Slurry balance shield tunneling machine with a diameter of 15.56m
Project breakthroughs: It is first shield tunnel with a super-large diameter in Guangzhou-Foshan area that penetrates through the Nanzhuang wharf in operation and the embankments on east and west banks.
Guangdong Zhuhai Maliuzhou Traffic Tunnel
Business Section:Tunnel
Location:Zhuhai, Guangdong Province
Project Starting Date: July 2014
Participating Mode:EPC
Shield Parameter:14.97-meter-long Diameter Earth Pressure Balance Shield
Project’s Breakthroughs:The First Massive-Diameter Underwater Shield Tunnel in China
Zhengzhou Zhongzhou Avenue Pipe Jacking Tunnel
Business Section:Tunnel
Location:Zhengzhou, Henan Province
Project Completion date:July 2014
Participating Mode:Managing Contractor
Pipe-Jacking Parameters: 7.5mX10.4m Section Rectangular Pipe Jacking Tunnel
Project’s Breakthrough:World’s Biggest Section of a Rectangular Pipe Jacking Tunnel
Shanghai City Sewage Treatment Line in Bailonggang Trunk Improvement Project (East Trunk Line) SST2.4
Business Section:Tunnel
Location:Shanghai
Project Completion Date:Dec. 2014
Participating Mode:Managing Contractor
Pipe-Jacking Parameters:4-Meter-Long Diameter Pipe Tunnel
Project’s Breakthrough:The Largest Diameter Sewage Pipe Tunnel in China
Shanghai Dapu Road Tunnel
Business Section:Tunnel
Location:Shanghai
Project Completion date:Project Completion date:
Participating Mode:Managing Contractor
Shield Parameter:10.2-meter Diameter Long Grid Extrusion Shield
Project’s Breakthrough:The First Road Tunnel in China and The First Shield Tunnel
Shanghai South Xizang Road Tunnel
Business Section:Tunnel
Location:Shanghai
Project Completion date: April 2010
Participating Mode:Managing Contractor
Shield Parameter:11.36-meter-long Diameter Slurry Balance Shield
Project’s Breakthrough:Large-Diameter Shield Crossing the Smaller-Diameter Metro Tunnel under Operation in Close Distance
Shanghai Outer Ring Tunnel
Business Section:Tunnel
Location:Shanghai
Project Completion Date:June 2003
Participating Mode:EPC
Pipe-Jacking Parameters:Immersed tunnel
Project’s Breakthrough:Asia's Largest Immersed Cross River Tunnel
Zhejiang Hangzhou Qianjiang Channel
Business SectionTunnel
Location:Hangzhou, Zhejiang Province
Project Completion Date:April 2014
Participating Mode: BOT
Shield Parameter:15.43-meter Diameter Slurry Balance Shield
Project’s Breakthrough:First BOT Super Large Diameter Shield Tunnel in China
Shanghai Bund Tunnel
Business Section:Tunnel
Location:Shanghai
Project Completion Date:March 2010
Participating Mode:EPC
Shield Parameter: 14.27-meter Diameter Earth Pressure Balance Shield
Project’s Breakthrough: The First Massive-Diameter Shield Tunnel under Complicated Environment in the World
Hubei Wuhan Sanyang Road Tunnel
Business Section:Tunnel
Location: Wuhan, Hubei Province
Project Completion date: Dec. 2013
Participating Mode:Managing Contractor
Shield Parameter:15.76-meter-long Diameter Slurry Balance Shield
Project’s Breakthrough:The Largest-Diameter “Railway and Road Co-Construction” Shield Tunnel in China