EPC project of caisson parking lot of Jianye District, Nanjing City
Location: Nanjing City, Jiangsu Province
Internal trial operation time: in 2022
Participation mode: Construction
Project breakthrough: The first intelligent caisson-type parking lot constructed by VSM sinking vertical shaft tunneling technology in China.
Comprehensive upper cover development and pile foundation project Ⅲ-G03D-02 at Shenkun Road Area of Hongqiao Business District and Shenkun Road parking lot for airport contact line
Location: Shanghai Municipality
Commencement time: June 2021
Participation mode: TOD mode
Project breakthrough: The first underground parking lot for municipal railway in China
First Phase Project of Huai’an Modern Tram
Business Section:Tram
Location:Huai’an, Jiangsu Province
Project Starting Date: 03, 2014
Participating Mode:BOT
Power Supply System:Energy Storage
Project’s Breakthrough:First Tram crossing City Center in China
Section II (Shaodu Road - Guangyuan Avenue section) of Yunfei Road Phase II (Shaodu Road - Middle Hungtong Road) project and civil engineering construction of Yaojiang New Area Utility Tunnel Phase I (Yunfei Road)
Location: Ningbo City, Zhejiang Province
Commencement time: April 2022
Participation mode:Engineering procurement construction
Wusongkou Yangtze River Tunnel Project for Shanghai-Nantong Railway Phase II (HTZQII-1 and HTZQII-4)
Location: Shanghai
Commencement time: December 2021
Participation mode:Engineering procurement construction
Shield tunneling machine specifications: Slurry-gas balance shield tunneling machine with a diameter of 10 m
Project breakthroughs: The first shield-type railway tunnel for both passenger and freight dug in a soft soil area in China; the first railway tunnel crossing the Yangtze River and Huangpu River in China; the first fully enclosed and lined shield tunnel in China.
The first bid section of Phase I Project of Fuzhou Metro Line 4
Location: Fuzhou City, Fujian Province
Commencement time: March 2018
Participation mode:Ordinary engineering procurement construction
Shield tunneling machine specifications: Earth pressure balance shielding machine
Nanjing Metro Line 5 Project
Location: Nanjing City
Commencement time: December 2016
Participation mode:Engineering procurement construction
Shield tunneling machine specifications: Earth pressure balance shielding machines with diameters of 6390 mm, 6440 mm, 6450 mm, etc.
Phase I project of Jiaxing Tram
Location: Jiaxing City, Zhejiang Province
Commencement time: May 2020
Completion / operation time: June, 2016 for the first section and June, 2022 for the whole line.
Project breakthroughs: The first tram in Zhejiang Province.
PPP project for integrated traffic hub of Wenling Station
Location: Shanghai Municipality
Commencement time: May 2022
Participation mode: PPP mode
The airport connection line project in urban rail transit line of Shanghai Metro
Location: Shanghai Municipality
Commencement time: June, 2019
Participation mode: Engineering procurement construction
Shield tunneling machine specifications: Slurry balance shield tunneling machine with a diameter of 14.05 m and earth pressure balance shielding machine with a diameter of 9.295 m.
Project breakthroughs: STEC adopted the 107.5-m super-deep diaphragm to dig a foundation pit as deep as 44 m, of which both are the greatest in the Shanghai rail transit field.
Shanghai World Expo Park Area B: Underground Space Integrated Development of Central SOEs Headquarters
Business Section:Underground Space Development
Location:Shanghai
Project Starting Date:12. 2011
Participating Mode:Design
Project Scale:Floor Area of 410,000 square meters
Tianjin Cultural Center Underground Transportation Hub
Business Section:Underground Space Development
Location:Tianjin
Project Completion Date:05,2012
Participating Mode:Design
Project Scale: Floor Area of 198,000 square meters
Shanghai Metro Line 16
Business Section:Rail Transport
Location:Shanghai
Project Operation Date:12, 2013
Participating Mode:Designing Contractor + Build
Project’s Breakthrough:First Single Underground Railway Tunnel with Dual Carriageway in China
Integrated Development of Underground Space in the Financial District of Tianjin Yujiabao
Business Section:Underground Space Development
Location:Tianjin
Project Completion Date:10,2014
Participating Mode:Design
Project Scale:Floor Area of 81,000 square meters
The First Phase Project of Zhuhai Modern Tram Line 1
Business Section:Tram
Location:Zhuhai, Guangdong Province
Project Starting Date:09, 2013
Participating Mode:Design
Power Supply System:Ground-level Power Supply
Project’s Breakthrough:First Ground-level Power Supply in China
Jiangsu Nanjing Metro Line 3
Business Section:Rail Transport
Location:Nanjing, Jiangsu Province
Project Operation Date:04, 2015
Participating Mode:Managing Contractor
Project’s Breakthrough:First Single Underground Railway Tunnel with Dual Carriageway Using Large-Diameter Shield Across the Yangtze River in China
Shanghai Metro 4-line Transfer Hub: Century Avenue Station
Business Section:Rail Transport Station
Location:Shanghai
Project Completion Date:2008
Participating Mode:Managing Contractor
Project Scale:Floor Area of 36,300 square meters
Suzhou High Tech Zone Modern Tram Line 1
Business Section:Tram
Location:Suzhou, Jiangsu Province
Project Completion Date:10, 2014
Participating Mode:Design
Power Supply System:Overhead Power Line
Project's Breakthrough:First 100% Low-Floor Tram with Steel Wheel and Steel Rail in China
Shanghai Metro Line 8
Business Section:Rail Transport
Location:Shanghai
Project Operation Date:12, 2007
Participating Mode:Design & Build
Project’s Breakthrough:First Double Circle Shield Tunnel in China
Shanghai Metro Line 9
Business Section:Rail Transport
Location:Shanghai
Project Operation Date:12, 2007
Participating Mode:Design + Build
Project’s Breakthrough:Across Metro Line 1 under Operation by using Super-Shallow Shield
Shanghai Metro Line 11
Business Section:Rail Transport
Location:Shanghai
Project Operation Date:12, 2009
Participating Mode:Designing Contractor + Build
Project’s Breakthrough:Crossing 23 Heritage Buildings Continuously in Short Distance
First Phase of Jiangsu Nanjing Metro Line S1
Business Section:Rail Transport
Location:Nanjing, Jiangsu Province
Project Operation Date:07, 2014
Participating Mode:Build & Transfer
Project’s Breakthrough:China’s First GPST Tunnel
Shanghai Metro Line 1
Business Section:Rail Transport
Location:Shanghai
Project Operation Date:12, 1994
Participating Mode:Build
Project’s Breakthrough:Shanghai’s First Underground Fast Track
Shanghai Metro Line 7
Business Section:Rail Transport
Location:Shanghai
Project Operation Date:12, 2009
Participating Mode:Designing Contractor & Build
Project’s Breakthrough:New Design Concept of Integrating Network, Humanity, Science, and Environmental-protection into Metro Stations