Phase II project of supporting utility tunnel for ethylene project in Hainan Yangpu Petrochemical Functional Zone
Location: Yangpu Economic Development Zone of Danzhou City, Hainan Province
Commencement time: September 2021
Participation mode: Engineering procurement construction
Replacement of "gas cylinder with gas pipeline" in residential areas and urban villages of Longgang District in 2022
Location: Shenzhen City, Guangdong Province
Commencement time: August 2022
Participation mode: Engineering procurement design and construction
Hydrogen refueling station at Qianwan Port of Qingdao Port, Shandong Province
Location: Qingdao City
Completion / operation time: April 2022
Production time: May 2022
Participation mode: Design
Project breakthroughs: The first hydrogen refueling station at a port in China.
Engineering procurement construction project (Section II) of design and construction of high-pressure natural gas pipeline from Leping to Baini
Location: Foshan City, Guangdong Province
Commencement time: It is expected to be in September 2022.
Participation mode: Engineering procurement design and construction
Project of jointly constructed station of Petro China Hydrogen Energy on Pingxiao Road
Location: Fengxian District of Shanghai Municipality
Commencement time: September 2021
Completion / operation time: December 2021
Participation mode: Integrative equipment procurement and construction contract
Project breakthroughs: It is the first jointly constructed oil-hydrogen station in Shanghai and the smallest jointly constructed oil-hydrogen station on the same scale in China.
SPIC hydrogen refueling station project at Binhai Economic Development Zone of Cixi, Ningbo
Location: Cixi City, Zhejiang Province
Commencement time: May 2021
Participation mode: Engineering procurement construction
Project breakthroughs: The first hydrogen refueling station without fixed cylinder pack in Zhejiang Province
Mingcheng integrated energy supply station in Foshan, Guangdong
Location: Foshan City, Guangdong Province
Commencement time: October 2021
Participation mode: EPC design, Procurement and construction
Project of jointly constructed station for four kinds of vehicle energy in the east of Yancheng
Location: Yancheng City, Jiangsu Province
Commencement time: February 2022
Participation mode: PC engineering procurement construction
Project breakthroughs: It succeeds in "three firsts".
“West east gas transmission” Shanghai natural gas trunk pipeline network system project
Business Section:Energy
Location:Shanghai
Participating Mode:Design & Construction
Gas Transmission Scale:16 billion cubic meters / year
Shanghai Xizang Road Electric Power Cable Tunnel
Business Section:Energy
Location:Shanghai
Project Completion Date: Feb. 2007
Participating Mode: Managing Contractor
Project Category:Electric Power Tunnel
Shanghai Pudong Foreshore Natural Gas Decentralized Energy Project
Business Section: Energy
Location: Shanghai
Project Starting Date:April, 2015
Participating Mode: Managing Contractor
Project Category:Energy Station
Jiangsu Nanjing Garbage Incineration Power Plant in North Venous Industrial Park
Business Section: Energy
Location:Nanjing, Jiangsu Province
Project Completion Date:March 2015
Participating Mode: Managing Contractor
Project Category: Garbage Incineration Plant
Shanghai Middle Yanggao Road Electric Power Tunnel
Business Section:Electric Power
Location:Shanghai
Project Completion Date:April 2006
Participating Mode:Managing Contractor
Project Category:Electric Power Tunnel
Macao Onshore Natural Gas Input and Transmission System
Business Section: Energy
Location:Macao
Participating Mode:Design + Build
Gas Transmission Scale: 126,000 Cubic Meters Per Hour
12th-Five-Year Plan of Shanghai Gas Development
Business Section:Energy
Location: Shanghai
Participating Mode:Plan
Gas Transmission Scale:400 thousand tons / year
Hainan CNPC Shennan LNG Storage Project
Business Section: Energy
Location:Hainan Province
Participating Mode:Design & Build
Gas Transmission Scale:4 million tons / year
Shanghai Tower Gas Drainage Pipe Project
Business Section: Energy
Location:Shanghai
Participating Mode: Design + Build
Gas Transmission Scale: 4,000 Cubic Meters Per Hour