6.34m-Diameter Earth Pressure Balance Shield

Business Section:Major Equipment
Production Place:Shanghai
Production Time:2003
Representative Project:Metro in Shanghai, Nanjing, Hangzhou, Tianjin and Ningbo

Φ11.22m Slurry Balance Shield

业务板块:重大设备
生产地:上海
投产时间:2008年
应用项目代表:上海黄浦江越江工程打浦路复线隧道

6.64m Articulated Earth Pressure Balance Rectangular Shield

Business Section:Major Equipment
Production Place:Shanghai
Production Time: 2007
Representative Project:C902, Downtown Line Stage 1, Singapore MRT

7.5m x 10.4m Large Cross-Section Rectangular Pipe Jacking Machine

Business Section:Major Equipment
Production Place:Shanghai
Production Time:2013
Representative Project:Zhengzhou Zhongzhou Avenue Pipe Jacking Tunnel

11.83m x 7.27m Earth Pressure Balance Rectangular Shield

Business Section:Major Equipment
Production Place: Shanghai
Production Time:2015
Representative Project:Ningbo Metro Line 3